background image

Page 6 of 9

507043-04

Issue  1832

6.  Measure indoor air (entering indoor coil) wet-bulb 

temperature with a sling psychrometer.

7.  Compare superheat reading at service valve with the 

chart located on control box cover.

8.  If unit has a higher suction line temperature than 

charted temperature, add refrigerant until charted 

temperature is reached,

9.  If unit has a lower suction line temperature than 

charted temperature, reclaim refrigerant until charted 

temperature is reached.

10.  Remove charge if superheat is low and add charge if 

superheat is high.

Units with Indoor TXV

Units installed with cooling mode TXV require charging 

with the subcooling method.

1.  Operate unit a minimum of 10 minutes before checking 

charge.

2.  Measure liquid service valve pressure by attaching an 

accurate gage to service port. Determine saturation 

temp. from T/P chart.

3.  Measure liquid line temperature by attaching an 

accurate thermistor type or electronic thermometer to 

liquid line near outdoor coil.

4.  Calculate subcooling (saturation temp. - measured 

temp.) and compare to table on back of control box 

cover. 

5.  Add refrigerant if subcooling is lower than range shown 

in table. Recover refrigerant to decrease subcooling.

6.  If ambient temp. is lower than 65° F, weigh refrigerant 

according to the name plate data.

NOTE: 

If a TXV is installed on indoor unit, a hard start kit will 

be required on all models with reciprocating compressors. 

Refer to the specification sheet for details. Hard start kits 

are also recommended for areas with utility power lower 

than 208 Vac.

System Operation

The outdoor unit and indoor blower cycle on demand 

from the room thermostat. When the thermostat blower 

switch is in the ON position, the indoor blower operates 

continuously.

Содержание 4AC14

Страница 1: ...ensed professional installer or equivalent service agency or the gas supplier WARNING Installation or repairs made by unqualified persons can result in hazards to you and others Installation MUST conf...

Страница 2: ...contact with water pipes duct work floor joists wall studs floors walls and any structure 7 Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap which comes in direct co...

Страница 3: ...tubes Split systems may be installed with up to 50 feet of line set no more than 20 feet vertical without special consideration For lines 50 feet or longer refer to long line set guidelines Do not lea...

Страница 4: ...ion lines and the indoor coil without disturbing the factory charge in the outdoor unit 3 Follow the vacuum pump manufacturer s instructions Allow the pump to operate until the system has been evacuat...

Страница 5: ...m of 10 minutes before checking charge 2 Measure suction pressure by attaching a gage to suction valve service port Determine saturation temp from T P chart 3 Measure suction temperature by attaching...

Страница 6: ...hing an accurate gage to service port Determine saturation temp from T P chart 3 Measure liquid line temperature by attaching an accurate thermistor type or electronic thermometer to liquid line near...

Страница 7: ...507043 04 Page 7 of 9 Issue 1832 Figure 3 A C Single Phase Wiring Diagram single speed condenser fan...

Страница 8: ...Page 8 of 9 507043 04 Issue 1832 Figure 4 A C Single Phase Wiring Diagram multi speed condenser fan...

Страница 9: ...trees can be drawn into coils by movement of the air Clogged condenser coils will lower the efficiency of your unit and cause damage to the condenser Periodically debris should be brushed from the con...

Отзывы: