INSTALLINg ThE ChARgINg pOLE

17

•  For safe return, transporting the pole fixed to a pallet is recommended.
•  Please note that the transport weight of the 

eMC2

 charging station including all 

packaging materials may necessitate the use of a forklift.

Mechanical installation on the EMC9999 foundation block 

For installation described as follows, the separately available 

EMC9998

 or 

EMC9997

 

plinths are required. For installation on the 

EMC9999

 foundation block you will need 

the following components:
•  Four M12 x 20 stainless steel hexagonal head bolts for fixing the plinth to the foun-

dation block (included with the foundation block)

•  Four washers for M12 x 20 hexagonal head bolts, minimum external diameter 37 

mm, (included with the foundation block)</7 

•  Torque wrench suitable for M12 x 20 hexagonal head bolts (size 18/19 mm, not 

included)

•  Spirit level if required (not included)

DANGER!   

During the entire installation process, the safety switches for all supply 

cables to the 

eMC2

 must be deactivated: Supply cables must under all 

circumstances be non-live and may only be reconnected to the electricity 

grid for taking the device into electrical operation at the conclusion of the 

installation process.

1.  Thread the power supply through the central opening in the plinth. Ensure that the 

supply cable protrudes sufficiently (>  50  cm) from the high temperature plastic 

tube in the foundation block.

2.  Position the four fixing holes in the base plate of the plinth above the threaded 

anchors in the foundation.

•  If you are using the 

EMC9998

 plinth, select the outer openings, which are 218 

mm apart (widthwise).

•  If you are using the 

EMC9997

 plinth, select the inner openings, which are 89 

mm apart (widthwise).

3.  Insert the four included M12 x 20 bolts through the matching washers and the 

openings in the plinth into the threaded anchors in the foundation block and tighten 

them using the torque wrench. For the prescribed strength grade 8.8, the tighten-

ing torque should be 35 Nm.

Содержание eMC2

Страница 1: ...eMC2 Charging pole Installation and Instruction Manual VERSION EMC2 2017 01 27 ARTICLE NO 0301600...

Страница 2: ...sum Bayerische Elektrozubeh r GmbH Co KG Albert B ttner Stra e 11 91207 Lauf Pegnitz Germany Phone 49 0 9123 188 0 Fax 49 0 9123 188 188 Web www abl de Email info abl de Support Phone 49 0 9123 188 60...

Страница 3: ...ole 5 Plinth 6 Foundations 7 Introduction 8 Product description 8 Identifying your product variant 9 Includes 10 Available accessories 11 Preparing for installation 13 Requirements for the installatio...

Страница 4: ...th RFID module only 23 Preparing access control via OCPP EMC444K only 24 Resolving errors 26 Operating status RFID module 27 Error codes for RFID module operation 27 Operational disruptions and soluti...

Страница 5: ...Sections marked with this symbol draw attention to further hazards that may lead to damage to the station itself or to other electric devices Ac tions marked with this symbol must be carried out with...

Страница 6: ...lf may only be repaired by authorized or qualified specialist personnel In case of installation faults or malfunctions that can be traced back to faulty installa tion always contact the contractor tha...

Страница 7: ...racteristic for the residual current circuit breaker Type B In this case please contact your distributor Operating instructions Maintenance Please note the following instructions for the operation and...

Страница 8: ...aning agents waxes or solvents such as cleaning fluid or paint thinner because they can dull the displays and damage the paint finish The eMC2 charging pole must under no circumstsances be cleaned wit...

Страница 9: ...ing pole is delivered fully assembled and checked All dimensions as well as the mounting points are indicated in the scale drawings below Charging pole Plan and elevation of the eMC2 series incl EMC99...

Страница 10: ...e foundation should be flush with the ground level Plan and elevations of the plinths scale 1 5 all dimensions in mm EMC9998 EMC9997 3 200 237 369 286 299 218 133 173 1 0 5 0 M 8 40 3 369 173 133 89 2...

Страница 11: ...ation block are given at the scale of 1 8 all dimensions in mm Should you wish to lay your own foundation for the eMC2 charging pole you must consider the requirements listed on page 33 285 286 426 89...

Страница 12: ...inistered and controlled efficiently while the integrated energy meters take care of the exact measurement of electricity consumption The data collected can then be made available to external applicat...

Страница 13: ...e screws needed for installation are included with the eMC2 It is strongly recommended never to operate the eMC2 in a public area without installing a cylinder lock Users are at all times informed abo...

Страница 14: ...her the following basic components are included Component Quantity Description eMC2 charging pole 1 Charging pole consisting of metal housing with lockable cover Installation and User Manual 1 Instruc...

Страница 15: ...the four screws included L x W x D 369 x 237 x 200 mm EMC9998 1 369 173 133 89 285 299 1 5 M 8 40 3 D E F C 1 2 3 4 B A 3 2 1 5 C D 4 6 7 8 A B Norm Blatt 1 1 Bl Ma stab Zeichnungsnummer Benennung Ge...

Страница 16: ...with remote signaling device on request 1 PLEASE NOTE Depending on your order a range of accessory components may al ready be preinstalled in the eMC2 Please contact your local distributor if you req...

Страница 17: ...ete foundation In the vicinity of the foundation the power supply must if necessary be protected against mechanical impact using a suitable hose or tube The ground at the installation site must allow...

Страница 18: ...he ground level at the installation site Please proceed as follows to lay down the separately available EMC9999 foundation block for installation of the charging pole 1 After selecting an appropriate...

Страница 19: ...elect dimensions ensuring stability in all directions and the secure instal lation of the eMC2 using one of the separately available plinths 2 Construct the formwork e g lost formwork 3 Place an empty...

Страница 20: ...ows you to reach the charging socket of your vehicle comfortably with the charging cable separately available for the eMC2 The cable must not under any circumstances be strained when connected to the...

Страница 21: ...ring the entire installation process the safety switches for all supply cables to the eMC2 must be deactivated Supply cables must under all circumstances be non live and may only be reconnected to the...

Страница 22: ...lts not included further information about fixings can be obtained from the manufacturer at www wuerth de Torque wrench suitable for W SA 14 mm hexagonal heads size 21 mm not in cluded Drilling templa...

Страница 23: ...Position the charging pole on the plinth so that the screw holes in the base plate of the charging pole are directly above the openings in the top plate of the plinth 4 Stick the included sealing tape...

Страница 24: ...ted 2 Now switch off all internal safety switches and RCCBs inside the charging pole 0 OFF 3 Open the domestic fuse box located in the lower part of the pole using the flat head screwdriver and flip t...

Страница 25: ...der lock in the flip out handle of the charging pole to prevent any unauthorized opening of the housing Commercially available size 40 or 45 half profile cylinders are suitable for this purpose PLEASE...

Страница 26: ...s a neu tral conductor a PE protective earth conductor as well as two signaling contacts Control Pilot and Proximity Pilot which ensure a secure connection and therefore the safe operation of the char...

Страница 27: ...you can obtain from the operator of your user portal Programming and registration of RFID access are via the central RFID module built into the top section of the eMC2 During programming registration...

Страница 28: ...rds in MIFARE format Set up and use of the RFID functions of the EMC444K depend directly on the respective user platform and therefore on its opera tor or service provider Apart from the required acce...

Страница 29: ...status indicator for the Type 2 charging socket in use will be permanently green When the charging pro cess begins the color of the status indicator will change to blue PLEASE NOTE Should a malfunctio...

Страница 30: ...ation the following colors and states of illumination are displayed by the LEDs Description illuminated OFF The charging station is ready for operation the vehicle may be connected for charging at any...

Страница 31: ...cess is being granted OFF illuminated for 1 sec Authentication of the transponder was NOT successful access to the charging process is NOT being granted PLEASE NOTE Should the RFID module of the eMC2...

Страница 32: ...f error The following errors may occur ERROR POSSIBLE CAUSE SUGGESTED SOLUTION LEDs are not functioning The eMC2 does not have a power sup ply The external power supply for the eMC2 is dis rupted Chec...

Страница 33: ...al current circuit breakers RCCB yourself every 6 months Every RCCB has a button with which to initiate the test function Proceed as follows to test the RCCB 1 Open the housing cover of the eMC2 using...

Страница 34: ...perature 30 C to 50 C Storage temperature 30 C to 85 C Max internal temperature 30 C to 55 C Relative humidity 5 to 95 no condensation Class of protection I Rated impulse withstand voltage Uimp 4 kV O...

Страница 35: ...ity 5 to 95 no condensation Class of protection I Rated impulse withstand voltage Uimp 4 kV Overvoltage category III Rated insulation voltage Ui 300 V AC Max ground resistance 10 Ohm with optional sur...

Страница 36: ...protection Degree of protection Description Class of protection I All electrically conducting parts of the device are connected at low resistance with the protective earth system of the fixed installa...

Страница 37: ...accommodate potential additional data and or control cables Also the bolt anchors for securing the base plate of the eMC2 must meet the specifications in order to guarantee the stabil ity of the charg...

Страница 38: ...oper functioning of the product The customer will be responsible for covering any arising transport costs However the manufacturer further rejects any damage claims that can be shown to have resulted...

Страница 39: ...tting diode MCB Miniature Circuit Break er Residual current circuit breaker OCPP Open Charge Point Protocol Communication protocol between charg ing station and service providers platform dependent PH...

Страница 40: ...ctrical and elec tronic devices including accessories must be disposed of separate from household trash The materials are recyclable as marked By re using recycling or through other forms of use of ob...

Страница 41: ...ion and declaration of compliance The eMC2 series charging poles carry the CE mark A copy of the declara tion of compliance is printed below and also available from ABL Sursum Bayerische Elektrozubeh...

Страница 42: ...Appendix 38...

Страница 43: ...Appendix 39...

Страница 44: ...MADE IN GERMANY Albert B ttner Stra e 11 D 91207 Lauf Pegnitz Tel 49 0 9123 188 0 Fax 49 0 9123 188 188 info abl de www abl de ABL SURSUM Bayerische Elektrozubeh r GmbH Co KG...

Отзывы: