pREpARINg fOR INSTALLATION
14
CAUTION!
Connecting the power supply to the domestic power distribution box
(rendered non-live by the operator of the distribution network) is car-
ried out by a qualified electrical contractor after installation and before
it is taken in into operation.
DANGER!
The power supply must be non-live at all times during the prepara-
tion of the foundation described in the following: The power supply
must only become live after installation is completed.
Violation of this rule results in danger of lethal electric shock!
Preparing for and setting the separately available foundation block
For the safe and proper installation of the eMC2 charging pole, ABL offers the sepa-
rately available
EMC9999
concrete foundation block, which provides a level installation
surface and factory installed bolt anchors for M 12 x 20 hexagonal bolts (included), en-
suring a high level of stability. In combination with the separately available
EMC 9998
and
EMC9997
plinths, the foundation block can be installed either subsurface or flush
with the ground level at the installation site.
Please proceed as follows to lay down the separately available
EMC9999
foundation
block for installation of the charging pole:
1. After selecting an appropriate site (see previous section), a pit to suit the founda-
tion block must be excavated. Please consider the dimensions of the foundation
block (L x W x D: 426 x 338 x 800 mm), sufficient working space and, if necessary,
a slope angle.
PLEASE NOTE:
If you are using the separately available
EMC9997
low plinth, the foun-
dation block is to be set flush with the ground surface.
If you are using the separately available
EMC9998
high plinth, you can
set the foundation block at a depth of between 800 and 960 mm below
ground level. Please consider installation depth when excavating.
2. Bring the foundation block into position inside the excavated pit. Ensure that the
power supply meets the tube set into the foundation block for it. Protect the power
supply in the area near the foundation block with a suitable hose or tube if neces-
sary.
3. Insert the non-live power supply into the opening of the tube in the foundation
block and ensure that cables protrude sufficiently or can be pushed out further in
order to carry out electrical connection without any problems.