EN - 17
CAT 3
7 Operation
7 Operation
As the
CAT 3
is integrated into the torch’s welding process, the operating steps
are performed after the respective torch has been put into operation.
8 Putting out of operation
Putting out of operation depends on the respective welding torch.
9 Maintenance and cleaning
Scheduled maintenance and cleaning are prerequisites for a long service life
and trouble-free operation. During such activities, observe the following:
NOTICE
• The device may only be operated by qualified personnel (in Germany
see TRBS 1203).
• Please also consult the operating instructions for the welding
components, such as the power source and compressed air line.
NOTICE
• When putting the system out of operation, ensure that the procedures for
switching off each of the welding system components are observed.
DANGER
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance,
servicing, assembly, disassembly and repair work:
• Switch off the power source.
• Close the compressed air supply.
• Close the gas supply.
• Switch off the entire welding system.
• Pull the mains plug at the robot welding power source.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and
damage.
• Replace any damaged, deformed or worn parts.
Содержание CAT3
Страница 4: ...DE 4 1 Identifikation CAT 3 1 1 EU Konformitätserklärung ...
Страница 24: ...EN 4 1 Identification CAT 3 1 1 EU Declaration of Conformity ...
Страница 41: ...EN 21 CAT 3 Notes Notes ...
Страница 44: ...FR 4 1 Identification CAT 3 1 1 Déclaration de conformité UE ...
Страница 63: ...FR 23 CAT 3 Notes Notes ...
Страница 66: ...ES 4 1 Identificación CAT 3 1 1 Declaración de conformidad de la UE ...
Страница 85: ...ES 23 CAT 3 Notas Notas ...
Страница 86: ...ES 24 Notas CAT 3 Notas ...
Страница 87: ...ES 25 CAT 3 Notas Notas ...