![Abicor Binzel CAT2 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/abicor-binzel/cat2/cat2_operating-instructions-manual_451548041.webp)
EN - 19
CAT2
7 Operation
7 Operation
Due to the fact that the CAT2 is integrated into the welding process of the torch,
the operating steps are performed after the respective torch has been put into
operation.
8 Putting out of operation
Putting out of operation depends on the respective welding torch.
9 Maintenance and cleaning
Scheduled maintenance and cleaning is a prerequisite for a long life and a
trouble-free operation. In doing so, observe the following:
NOTICE
• The system may only put into operation by authorized personnel
(in Germany see TRBS 1203).
NOTICE
• Please make sure that the shutdown procedures for all components
mounted in the welding system are strictly observed before putting out of
operation begins.
DANGER
Risk of injury due to unexpected start-up.
The following instructions must be adhered to for the entire duration of
maintenance, servicing, mounting, dismounting and repair work:
• Switch off the power supply.
• Close off the compressed air supply.
• Disconnect all electrical connections.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and
damage.
• Replace any damaged, deformed or worn parts.
Содержание CAT2
Страница 4: ...DE 4 1 Identifikation CAT2 1 1 EU Konformitätserklärung ...
Страница 5: ...DE 5 CAT2 1 Identifikation ...
Страница 26: ...EN 4 1 Identification CAT2 1 1 EU Declaration of Conformity ...
Страница 27: ...EN 5 CAT2 1 Identification ...
Страница 48: ...FR 4 1 Identification CAT2 1 1 Déclaration de conformité CE ...
Страница 49: ...FR 5 CAT2 1 Identification ...
Страница 70: ...ES 4 1 Identificación CAT2 1 1 Declaración de conformidad de la UE ...
Страница 71: ...ES 5 CAT2 1 Identificación ...
Страница 90: ...ES 24 Notas CAT2 Notas ...
Страница 91: ...ES 25 CAT2 Notas Notas ...