![Abicor Binzel BRS-LCi Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/abicor-binzel/brs-lci/brs-lci_operating-instructions-manual_451475033.webp)
BRS-LCi
6 Putting into operation
EN - 15
6.10 Flow chart
The turning control inquiry via the inductive proximity switch (S3) is performed via a flank evaluation of the
signal in the higher-ranking control.
Fig. 12
Flow chart
Cleaning &
Spraying
Approach
position P1
Detect and
remove the
Approach
position P2
Output
Y2 = I
Waiting time
approx. 0.5 sec.
Output
Y1 = I
Waiting time
approx. 2 sec.
Output
Y1 = 0
Output
Y4 = 1
Output
Y4 = 0
No
cause
Yes
Input
Ready = I
Options
Air blast = 1
Waiting time
approx. 1 sec.
Output
Y2 = 0
Options
Air blast= 0
Move out of
maintenance
Yes
(Cable assembly)
(Cable assembly)
Options
Air blast = 1
(Cable assembly)
Options
Air blast = 0
(
Cable assembly
)
Input
S2 = 0
S3 = 1
Input
S4 = I
Input
S1 = I
Detect and
remove the
No
cause
Detect and
remove the
No
cause
Yes
Detect and
remove the
No
cause
Yes
Input
Ready = I
Detect and
remove the
No
cause
Ready = 1:
S1 = 1
S3 = 0
S4 = 0
S2 = 1
S3 = 0
No Flank change?
Flank change?
S3 = 1
station
Output
Y3 = 1
Waiting time
approx. 0.5 sek.
Output
Y3 = 0
Cleaning procedure
terminates
NOTE
• If the working pressure is too low, the waiting time for injection may increase.
• If the waiting time for air-blasting is too long, the waiting time for injection may increase.
• The injection results depend on the waiting times for air-blasting and the working pressure.
Содержание BRS-LCi
Страница 19: ...BRS LCi 12 Entsorgung DE 19 ...
Страница 38: ...EN 20 12 Disposal BRS LCi ...
Страница 56: ...BRS LCi 12 Elimination FR 19 ...
Страница 74: ...BRS LCi Notizen Notes Notes Notas ES 19 Notizen Notes Notes Notas ...
Страница 75: ...ES 20 Notizen Notes Notes Notas BRS LCi ...