28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 1 Power Supply Check [NON-CE MARK]
3 - 12
3
Figure 3-2 E and G Loaders [NON -CE MARK] Power Distribution
--- END ---
Red
Yellow
Black
1
GND
+5V
+12V
-12V
Gray
White
AC
Input
Gray
White
Purple
Power
Switch
Purple
+ -
Green
115/230V
Switch
SL-252
Red
Black
24V
P.S.
Green
Use Pin 1 (GND)
to Measure
P5 Voltage
P5 to Decoder Bd
+5/+12/-12V
P.S.
AC
White
White
White
Green
Black
Red
U8
CPU Main Bd
CN1
1
4
1
3
+5V
+ -
+ -
+24V
Fuse
Red