7.4 Working and auxiliary materials
7.4.1 Working materials
•
Insulating gas system
•
Sulphur hexafluoride (SF
6
) Delivery form:
liquid gas in steel cylinders Observe the quality
requirements to IEC 60376/VDE 0373
Observe the relevant ABB instruction manual BA
1004/E, pp. 1 to 3, on safety at work!
Note
If extreme temperatures ≥50
℃
Ccannot be
ruled out where gas cylinders are stored,
transported or tempo rarily stored in the
open air in direct sunlight, a reduced filling
factor of 0.75 kg/l cylinder contents is to be
required when ordering for safety reasons!
•
Drying agent material:
Drying agent bag to DIN 55 473,
capacity per bag 210 g
7.4.2 Auxiliary materials
•
Lubricants:
Isoflex Topas NB 52
•
Assembly paste, for insulating part/cast resin
plug connections
•
Silicone paste for greasing of o-rings
•
Cleaning agent for busbar insulating parts
busbar sockets and cable sockets: Cable
cleanser MAB
•
Paintwork:
Paint in standard colour RAL 7035
-
1 kg-box
-
Spray tin
•
Coupling piece with hose connection for gas
connector (optional)
Part no. (Orderref.)
GCE0990253P0103
GCEA901004P0102
GCE0990443P0100
GCE0007249P0100
GCE0009098P0101
GCE0009048P0102
GCE0009100P0100
GCE9014060R0103
GCE0007895P0100
GCE0905093P0100
Circuit breaker compartment
Circuit breaker
Circuit breaker operating mechanism
Pressure relief disk, above
Test socket
Blind plug
Measuring sockets for capacitive voltage
indicator
Plug-in cable socket
Pressure sensor for circuit breaker
compartment
Pressure relief duct (optional)
Absorber (optional)
Drying agent bag, circuit breaker
compartment
Bushing circuit breaker compartment /
busbar compartment
Filling valve for circuit breaker compartment
Protection cover for current transformer
terminal board
Cover for metering cables
Handling bracket (to be removed after
handling)
Edge protection
Socket head screw M 8x25
Hexagon nut M 8
Dished washer8
Centre of gravity
ON-release shaft
OFF-release shaft
Cam
Mechanical interlock circuit breakerr/
three-position switch
Lever
Clamping piece
Clamping screw
Tee-off conductor, bus-coupler
Tee-off conductor bus-riser
Front plate
On push button
OFF push button
Operating cycle counter
Mechanical position indicator
Rating plate
Charging condition indicator
Recess for charging lever (6.3)
Terminal board for current transformer
Auxiliary switch
Busbar compartment
Three-position switch
Three-position switch operating
mechanism
Pressure sensor for busbar compartment
Busbar
Plug-in busbar connector
Tee-off conductor, metering panel
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.14
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
2.0
2.1
2.2
2.3
2.4
2.5
2.6
Support
Plug-in socket for voltage transformer
Isolating system for voltage transformer
Tee-off conductor
Pressure relief disk for busbar
compartment
Drying agent bag, busbar compartment
Busbar socket
Insulating part
O-Ring
Socket head bolt M 10x50
Guide pin
Hexagon nut M 10
Dished washer 10
Socket head bolt M 10
Bus connector
Flap
Bore for padlock
Central gas connector for busbar
compartment
Drive motor for three-position switch
Hollow shaft (emergency manual
operation shaft)
Mechanical switch position indicator
Sensor, disconnector ON
Sensor, disconnector OFF
Sensor, earthing switch ON
Sensor, earthing switch OFF
Bore for padlock
Contact ring
Manual drive for isolating device
Tie wire
Auxiliary switch
Microswitch, disconnector on
Microswitch, disconnector off
Microswitch, earthing switch off
Microswitch, earthing switch on
Blocking magnet
Slide (mechanical operation circuit
breaker ON)
Cable termination compartment
Main earthing bar
Panel / panel connecting link
Cable mounting (optional)
Cable plug
Pressure relief flap, optional
Lower pressure relief duct
High voltage cable
Parallel connector PB50,
GCE 0909125P0100
Floor plate splitted
Reducer ring
Cable mounting
Supporting section, at earth potential
Rear panel compartment
Supporting section, at earth potential
Pressure relief flap, optional
Socket for fully insulated bar
Fully insulated bar
Venti lator
Control cabinet
Central unit of the Bay Control and
Protection Unit
HMI of the Bay Control and Protection Unit
Control cabinet door
Door-lock
Measuring sockets for capacitive
voltage indicator, optional
Light-emitting diode (LED)
LC-Display of the Bay Control and
Protection Unit
Closing lever
Double bit lock or security lock
Measuring facilities
Current transformer
Plug-in voltage transformer
Block-current transformer
Terminal board for current transformer
Accessories
Hand crank
Double bit key
Charging lever for emergency manual
operation
Test plug for high voltage tests, optional
Test plug for current tests, optional
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
4.0
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5.0
5.1
5.2
5.3
5.4
6.0
6.1
6.2
6.3
6.4
6.5
Foundation frame
Longitudinal bracket, (this one for panel
width 600 mm)
Longitudinal bracket, internal (this one
for panel width 600 mm)
Transverse bracket, left (this one for
panel depth 1300 mm)
Transverse bracket, right (this one for
panel depth 1300 mm)
Fixing angle bracket
Connecting link
Transverse bracket for two panel frame,
(this one for panel depth 1300 mm)
Connecting angle
Screwed connection for foundation frame
Socket head bolt M 8x25
Socket head bolt M 10x25
Socket head bolt M 8x25
Socket head bolt M 8x25, frame height 40 mm
Socket head bolt M 8 x 35, frame height
50 mm
Partition plate
Dished washer8
Dished washer 10
Washer8
Nut M10
Fixing dowel
7.0
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.20
7.21
7.22
7.23
7.30
7.5 Disposal
Disposal of the client s systems and components
and the client swaste, residue materials and used
substances can be performed by ABB. ABB
performs such disposal as a service enterprise in
connection with its servicing and installation.
activities.
The client's waste materials are passed on to
authorized disposal specialists close to the
point of origin.