![ABB ZSD 2020 Скачать руководство пользователя страница 50](http://html.mh-extra.com/html/abb/zsd-2020/zsd-2020_overhaul-instructions_3045399050.webp)
Date: 2021-01-13
Version: 1.2
Overhaul instructions
Central lubrication unit
Installation
Page 50 of 50
•
Reconnect all connectors (
43
and
47
).
Figure 35: Fitting the local control switch
Item number
Designation
(
43
)
Sensor/actuator connector
(
47
)
Sensor/actuator plug
•
Start the system and check the correct function of each component.
© 2021 ABB Automation GmbH |
en