![ABB ZSD 2020 Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/abb/zsd-2020/zsd-2020_overhaul-instructions_3045399037.webp)
Date: 2021-01-13
Version: 1.2
Overhaul instructions
Central lubrication unit
Installation
Page 37 of 50
•
Engage the clamp fastener into the corresponding hooks.
•
Tighten the two clamp fasteners (
51
) so that the plate is firmly seated on the container.
Figure 22: Closing the clamp fasteners
Item number
Designation
(
51
)
Clamp fastener
•
Start the system and check the correct function of each component.
© 2021 ABB Automation GmbH |
en