2104349 rev. AD
Page 1
–21
The battery compartment shelf houses various optional battery packs that are
available for the OEU, from eight (8) ampere hours up to 26 ampere hours.
Installation of the battery is discussed later in the manual.
The 6270 OEU system with battery and solar panel is rated for
Class I, Division 2 locations only or can be installed in non-
hazardous locations.
Figure 1
–18 Optional communication enclosure
1.2.8 Solar panel
A solar panel can be configured in the system to provide a charging source for the
battery. DIV 1 installations would require that the solar panel and battery pack be
installed in a General Purpose or DIV 2 area. Typically, the solar panel would be
connected through a charger regulator that is located in the 6270 OEU.
Depending upon power/charging requirements, the unit may be configured for a 5-
watt, 10-watt, 20-watt or 30-watt solar panel. The panel is designed to be mounted
on a 2-inch extension pipe.
Содержание XSeries G4 6200
Страница 41: ...2104349 rev AD Page 1 27 Figure 1 22 Ethernet communication cable Figure 1 23 Ethernet connectivity diagram ...
Страница 42: ......
Страница 61: ...2104349 rev AD Page 2 19 Figure 2 18 G4 EX to UPS ...
Страница 62: ......
Страница 130: ......
Страница 163: ...2104349 rev AD Page 33 ...