Figure 5
–7 Communication troubleshooting flow chart
5.4.2 Setting up communication
After the installation of the communication equipment and before placing the
communication system into operation, the user should note the following:
-
Verify the field wiring terminations on the G4 EX termination board.
-
Verify the field wiring from the G4 EX unit to the termination board inside the
6270 OEU enclosure.
-
Verify the field wiring from the termination board to the radio.
START
Does Unit
Respond to Host
Comm Request?
RS-232
Communication
Test
YES
NO
Verify unit
ID#, Security
Code and
Protocol are
Correct.
NO
YES
Verify jumper
and terminal &
pin wiring are
correct.
END
Transceiver
Supply voltage
within Specs?
YES
Voltage supply
from unit
> 11.9 VDC?
NO
Investigate
Power Supply
Issues
Figure 5-4
Transceiver
Comm Check
Substitute
Communication
Test Cable
Transceiver
Supply voltage
Test
Investigate
Transceiver
Issues
Unit Respond to
Host Comm
Request?
YES
NO
RS-485
Communication
Test
Is
Communication
RS-232?
YES
NO
Is
Communication
RS-485?
YES
NO
Contact
Totalflow
Technical
Support
Does Unit
Respond?
NO
YES
Test Passed?
NO
YES
Содержание XSeries G4 6200
Страница 41: ...2104349 rev AD Page 1 27 Figure 1 22 Ethernet communication cable Figure 1 23 Ethernet connectivity diagram ...
Страница 42: ......
Страница 61: ...2104349 rev AD Page 2 19 Figure 2 18 G4 EX to UPS ...
Страница 62: ......
Страница 130: ......
Страница 163: ...2104349 rev AD Page 33 ...