![ABB XAC20409 Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/abb/xac20409/xac20409_operation-manual_3797607068.webp)
Operation Manual / 4 Product description / A100-L
6 Periodic maintenance / 6.5 Cleaning the turbine during operation
© Copyright 2018 ABB. All rights reserved.
HZTL4034_EN
Revision N
November 2018
6.5.2
Procedure for dry cleaning the turbine
Dry cleaning device
Fig. 19: Overview of dry cleaning device
11
Granulate container (51702)
16
Protection valve [closed] (51713)
12
Cover cap (51703)
17
Pressurised air valve [venting] (51704)
13
Pressurised air supply [4 ... 7 bar]
18
Plate
14
Piping
19
Cleaning instructions (51717)
15
On-Off valve [closed] (51705)
20
Gas inlet casing, insulated
CAUTION
Protecting the pressurised air system
u
Protect the pressurised air system against overpressure (> 7 bar).
Page
40
/
110