Содержание Welcome M2306

Страница 1: ...lcome Pos 2 DinA4 Anl eitun gen Online Inh alt KNX Doo rEntry 832 20 AP xxx Tit elblat t 832 20 AP xxx ABB 1 9 m od_ 132 3249 806 476 _15 docx 11 108 4 1 Lift control module M2306 M2307 E nde der List...

Страница 2: ...9 6 Mounting Installation 10 6 1 Requirements for the electrician 10 6 2 Mounting 12 7 User case 13 7 1 High building no more than 16 floors with one lift 13 7 2 High building more than 16 floors with...

Страница 3: ...Umw elt F r all e Doku me nte Hinweis e Hinw eis U mwelt Hinweis Elektr oge r te 1 8 mo d_1 302 763 973 434 _15 docx 10 350 0 1 Consider the protection of the environment Used electric and electronic...

Страница 4: ...n Dimm er Tec hnisch e Dat en 65 91 U 101 2 3 mo d_1 333 089 085 280 _15 docx 20 703 9 1 General Single wire clamps 2 x 0 28 mm 2 x 0 75 mm Fine wire clamps 2 x 0 28 mm 2 x 0 75 mm Bus voltage 20 30 V...

Страница 5: ...6 and lift control relay module M2307 These two devices together ensure that lift elevator only goes to authorized floor s If a resident presses the unlock button when receiving a guest s call from th...

Страница 6: ...r M odul Strukt ur O nline Doku me ntatio n Anschl uss Dim me r Anschl uss 659 1 U 101 23 mo d_1 333 0939 200 08_ 15 d ocx 207 132 1 Fig 1 No Function 1 Status ON Connected with the system controller...

Страница 7: ...chl uss 659 1 U 101 23 mo d_1 333 0939 200 08_ 15 d ocx 207 132 1 Fig 2 No Function 1 Power LED ON Power on OFF Power off 2 Setting LED Blinks when working normally 3 Address Set the module address Th...

Страница 8: ...lcome Pos 24 B usch J aeg er Neus truk tur M odul Strukt ur O nline Doku me ntatio n Steu er mod ule Onlin e Dok ume ntati on F r alle Dok ume nte S eiten umb ruch 9 m od_ 126 8898 668 093 _0 docx 521...

Страница 9: ...lcome 5 3 Lift control relay module address by binary setting Fig 3 Installer needs only read the labeling on the lift control module and adjust according to the given position Only digits 1 2 3 4 are...

Страница 10: ...nstallation and or disassembly Permit work on the 110 240 V supply system to be performed only by specialist staff Pos 35 B usch J aeg er Neus truk tur M odul Strukt ur O nline Doku me ntatio n Siche...

Страница 11: ...nd requirements for the installation are as follows Apply the five safety rules DIN VDE 0105 EN 50110 1 Disconnect the power 2 Secure against being reconnected 3 Ensure there is no voltage 4 Connect t...

Страница 12: ...r g eeign etes A ufput zgeh aeu se Ohn e Docv aria ble 20 mod _13 257 6603 445 3_1 5 d ocx 1365 93 1 The device must only be installed on mounting rails according to DIN EN 50022 It is highly recomme...

Страница 13: ...16 floors with one lift One M2306 and one M2307 Pos 41 B usch J aeg er Neus truk tur M odul Strukt ur O nline Doku me ntatio n In bet riebn ahm e Dim me r Inb etri ebn ahm e 659 1 U 1 01 19 mo d_1 31...

Страница 14: ...ABB Welcome Wiring with one M2306 and one M2307 Fig 7...

Страница 15: ...ABB Welcome 7 2 High building more than 16 floors with one lift one M2306 and multi up to 16 M2307 Fig 8 Topology...

Страница 16: ...multi M2307 Fig 9 Notes 1 The first mini system controller M2301 feeds one M2306 and one M2307 2 An additional M2307 should be locally powered by one mini system controller Eg with 4 M2307 and 1 M2306...

Страница 17: ...ABB Welcome 7 3 High building more than 16 floors with two lifts one M2306 and multi M2307 support 2 lifts Fig 10 Topology Note The address code can not be repeated...

Страница 18: ...o M2306 and multi M2307 support 4 lifts Fig 11 Topology Pos 42 Busch Jaeger Neustruktur Modul Struktur Online Dokumentation Steuermodule Online Dokumentation F r alle Dokumente Seitenumbruch 9 mod_126...

Страница 19: ...eg er Neus truk tur M odul Strukt ur O nline Doku me ntatio n Steu er mod ule Onlin e Dok ume ntati on F r alle Dok ume nte S eiten umb ruch 9 m od_ 126 8898 668 093 _0 docx 521 49 1 1 Visitor inputs...

Страница 20: ...l module will not function if the unlock button is pressed without a call from building outdoor station E g unlock when there is a villa floor outdoor station or gate station 1 The resident living on...

Страница 21: ...ly to the PC so that the installed software ABB Welcome PC Configuration Tool can be used Essentially there is no need for local power supply during configuration Upon completing configuration click S...

Страница 22: ...g 15 No Function 1 Select building number 2 Select floor number 3 Select apartment number 4 Set physical address e g 13 means the IS address set by IS switches 5 Set user name 6 Set logic address e g...

Страница 23: ...M2307 number 3 Click Add to add a new M2307 4 Select ON or OFF for connecting the relay 5 Select NO or NC for output type 6 Set relay operation time 1 3 600 seconds 7 Show all M2307 parameters Note In...

Страница 24: ...ame as step2 2 Select outdoor station number 3 Select Relay No of M2307 4 Click Add to associate outdoor station with relay 5 Send all parameters to M2306 6 Input password Default password is 123456 P...

Страница 25: ...as step2 2 Select indoor station physical address 3 Select relay number of M2307 4 Select outdoor station number floor number of outdoor station installed 5 Click Add to associate indoor station with...

Страница 26: ...project or import data for new project Fig 19 No Function 1 Export all lift control configuration data to one read only Excel file Export the lift control configuration of each building for future re...

Страница 27: ...ABB Welcome Step 6 Save as one new project Fig 20 No Function 1 Save as one new project xml 1...

Страница 28: ...ABB Welcome Step 7 Import existing project data to new outdoor station guard unit and lift control Fig 21 No Function 1 Open one existing project xml 1...

Страница 29: ...d specifications agreed to at the time of ordering applies to all orders ABB accepts no responsibility for possible errors or incompleteness in this document We reserve all rights to this document and...