Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
9
3 Delivery
3.1 Incoming inspection
•
Make sure that all items have been delivered, refer to the packing list.
•
Carefully inspect the tap-changer for shipping damage.
If damage is found, submit the following to ABB:
•
A damage report with photos of the damaged parts.
•
ABB's order number.
•
The tap-changer's serial number.
•
The crate number.
3.2 Transportation
•
The tap-changer must be transported in the transport box.
•
Carefully inspect the tap-changer for damage after transportation.
3.3 Storage
Short and long term storage
•
Store the tap-changer and motor-drive mechanism indoors, in a controlled temperature with low
humidity.
•
Keep the units in their moisture-proof wrapping.
•
Do not remove the drying agent before installation.
•
Replace the drying agent, if it has been exposed to the atmosphere.
CAUTION!
Do not store the tap-changer or motor-drive mechanism in an environment with high humidity or
varying temperatures. Condensation can cause corrosion.
Содержание VUBB
Страница 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Страница 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...