INTERLOCKS BETWEEN PANELS
APPAR ATUS CO NTRO L TESTING
46
1VLG5000 17 C
Step 1/5
All circuit breakers must be in the test position. Check their status on the protection relay
LHMIs on the Single line diagram.
Figure 67: Single line diagram, the circuit breaker is in the test position
Step 2/5
Check the busbar earthing switch shutter. It can be open and the crank inserted.
Step 3/5
Move the circuit breaker out of the test position about a half-turn of the crank in one feeder.
Check the circuit breaker position on the protection relay LHMI.
Figure 68: Single line diagram, the circuit breaker is in the intermediate position
Step 4/5
Check the busbar earthing switch shutter. It cannot be open (crank cannot be inserted).
Step 5/5
Repeat step 3 and 4 for each feeder in the relative section
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...