APPAR ATUS CO NTRO L TESTING
PANEL INTERNAL INTER LO CKING
1VLG5000 17 C
37
Step 2/6
Insert the earthing switch crank on the shaft. Check the status on the protection relay LHMI.
Figure 52: Single line diagram, the earthing switch shutter is open
Step 3/6
Check that the circuit breaker cannot be moved into service position when the earthing
switch crank is inserted.
Step 4/6
Remove the earthing switch crank from the shaft. The shutter must be closed. Check the
earthing switch status on the protection relay LHMI.
Figure 53: Single line diagram, the earthing switch shutter is closed
Содержание UniGear Digital
Страница 1: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 2: ......
Страница 3: ...DISTRIBUTION SOLUTIONS UniGear Family UniGear Digital Commissioning and testing Guide...
Страница 6: ......
Страница 10: ......
Страница 12: ......
Страница 88: ...SECONDARY TEST SETUPS SECONDARY TESTING OF PROTECTION RELAYS 76 1VLG500017 C Figure 119 Measurements view...
Страница 96: ......
Страница 98: ...Visit us www abb com mediumvoltage Document Number 1VLG500017 Rev C...