I
ndependent channel configuration (default configuration)
This configuration is factory set and enables independent use of the two
input channels (MPPT). This means that the jumpers (supplied) between
the positive and negative poles of the two DC input channels do not need
to be installed, and that the mode selected in the "SETTINGS>Input
Mode" menu must be “INDEPENDENT”.
P
arallel channel configuration
This configuration requires the use of the two
input channels (MPPT)
connected in parallel. This means that the jumpers (supplied) between
the positive and negative poles of the two DC input channels must be
installed, and that the mode selected in the “SETTINGS>Input Mode”
menu must be “PARALLEL”.
Jumper installation (supplied with the inverter) is carried out in two different positions, according to
the presence or otherwise of the DC disconnect switch
08
inside the inverter.
TRIO-7.5-TL-OUTD e TRIO-8.5-TL-OUTD - Models without DC disconnect switch
Install the jumpers for the positive poles between terminal
TB1 and TB19
and that of the negative poles between
TB8 and TB15
Models with DC disconnect
switch
-
VI1
+
VI1
+
VI2
-
VI2
J3
J5
J10
TB20
TB17
TB10
TB2
TB19
TB15
TB8
TB1
J8
J2
J1
-
VI1
+
VI1
+
VI2
-
VI2
J3
J5
J10
TB20
TB17
TB10
TB2
TB19
TB15
TB8
TB1
J8
J2
J1
-
VI1
+
VI1
+
VI2
-
VI2
J10
TB20
TB17
TB10
TB5
TB9
TB16
TB18
TB19
TB15
TB8
TB1
J8
J2
J1
-
VI1
+
VI1
+
VI2
-
VI2
J10
TB20
TB17
TB10
TB5
TB9
TB16
TB18
TB19
TB15
TB8
TB1
J8
J2
J1
Models without DC disconnect
switch
-
VI1
+
VI1
+
VI2
-
VI2
J3
J5
J10
TB20
TB17
TB10
TB2
TB19
TB15
TB8
TB1
J8
J2
J1
-
VI1
+
VI1
+
VI2
-
VI2
J3
J5
J10
TB20
TB17
TB10
TB2
TB19
TB15
TB8
TB1
J8
J2
J1
-
VI1
+
VI1
+
VI2
-
VI2
J10
TB20
TB17
TB10
TB5
TB9
TB16
TB18
TB19
TB15
TB8
TB1
J8
J2
J1
-
VI1
+
VI1
+
VI2
-
VI2
J10
TB20
TB17
TB10
TB5
TB9
TB16
TB18
TB19
TB15
TB8
TB1
J8
J2
J1
07
07