1YSA160003-EN - Rev. 5
11 / 19
Table 1 and 2.
D.4.3.4.
Closing of the Unit
Once the calibration current and counts are set, cover the dip-switch with silicon grease (See Figure 3), supplied with AutoLink.
Figure 9.
Check the condition of the O-Ring (See Figure 2-E) and apply silicon grease (See Figure 4-F) both inside the cap and over the dip-
switches.
Содержание Three Phase Mechanical AutoLink
Страница 15: ...1YSA160003 EN Rev 5 15 19 Figure 16 ...