
TERRA DC WALLBOX UL
2020-10-05
21/38
5
Receiving, Placing and connecting
5.1
Receiving the Terra DC Wallbox
The product is delivered by a transport company to a warehouse where it will be handed over.
Transporting the Terra DC Wallbox to its final location (last mile service) is not included standard in the
order.
NOTICE
The delivery truck unloads the pallet carrying the Terra DC Wallbox.
The movement of the Terra DC Wallbox to its final location is the re-
sponsibility of the customer / contractor.
Ensure the Terra DC Wallbox has not been shaken or tilted.
•
The cabinet is equipped with Shock Watch and Tilt Watch indicators.
Checking the Shock Watch and Tilt Watch PLUS sensors:
If the Shock Watch indicator is red, or the Tilt Watch PLUS indicator is tilted over 30°:
1.
Do not refuse the delivery / receipt.
2.
Make a notation on the delivery receipt and inspect cabinet for damage.
3.
If damage is discovered, leave cabinet in original package and request immediate inspection
from carrier within 3 days of delivery.
4.
Contact your local ABB office.
5.2
Unpacking the charging and mounting preparations
5.2.1
Unpacking
The packaging of the Terra DC Wallbox can be removed without the use of tools. Follow local regulations
on disposal of packaging material.