Procedure
1. Open the front door. Refer to section
2. Set the manual switch to the
1 position (vertical).
Warning:
General hazard
•
Be careful and use both your hands to turn the manual switch. You
need some force to turn the switch.
3. Close the front door. Refer to section
The EVSE starts. The display shows a message when the EVSE is ready for
operation.
6.4
Remove condensation from the cabinet
Preliminary requirements
•
Installation engineer
Owner
Note: If the EVSE is off for more than two hours, condensation can occur.
Procedure
1. Open the front and right doors. Refer to section
2. Set the main breaker to the off position.
3. Energize the EVSE. Refer to section
4. Close the doors. Refer to section
.
5. Wait four hours.
The internal heater of the cabinet heats the inside of the cabinet and lets the
condensation evaporate.
6. Open the front and right doors. Refer to section
7. Set the main breakers 1 and 2 to the on position.
a. Set the main breakers from the
Off to the Manual position.
b. Set the main breakers from the
Manual to the Auto position.
8. Close the doors. Refer to section
.
6.5
Local service portal operations
6.5.1
Start the local service portal
Preliminary requirements
•
The EVSE is ready for
operation. No charge
session is in progress.
•
Installation engineer
Operation
9AKK108467A6398-EN | 002
81
Содержание Terra 360 CE
Страница 1: ...Operation and installation manual Terra 360 180 60 CE Copyright ABB All rights reserved ...
Страница 92: ...Procedure 1 Remove these parts 1 Fasteners A 2 Border covers B B A Access to parts 92 9AKK108467A6398 EN 002 ...
Страница 129: ...11 Appendix 11 1 Declaration of conformity Appendix 9AKK108467A6398 EN 002 129 ...
Страница 130: ...Appendix 130 9AKK108467A6398 EN 002 ...
Страница 134: ......