
46
SCU200
INSITE ENERGY MANAGEMENT SYSTEM
6.3.2.Contracts
This page allows you to create or remove Contracts and Tariffs. By clicking on “Add new contract”, it is
possible to create a new contract. One contract can be assigned to single tag related to: energy, water or
gas (water and gas only for contract type: virtual)
It is possible to select Contract type:
Meter managed
– Available only for meters which are supporting tariffs on their own, No. Tariff is number
of configuration slot that represents this tariff on meter side
Virtual
– For virtual contracts it is possible to configure time slots for each tariff along with cost. Time
slots can’t overlap within a single contract. Costs will be calculated only during configured timeslots
according to configured cost.
For each contract it is possible to associate one or more Tariffs by clicking button “Add tariff” and
configuring it.
One device can be assigned to multiple contracts.
By clicking on the pencil icon “Edit” it is possible to edit all the fields of the selected contract. By clicking
on checkbox and then on button “Remove”, the selected contracts will be deleted.
The values from devices in one contract are summed by tags (for Modbus RTU/TCP devices tags can be
configured per register) and they can be presented on dashboard widget or in historical values.
Содержание SCU200
Страница 1: ...SCU200 User manual 1 0 1 INSITE ENERGY MANAGEMENT SYSTEM SCU200 User manual ...
Страница 2: ......
Страница 77: ...77 SCU200 INSITE ENERGY MANAGEMENT SYSTEM ...