![ABB SCU200 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/abb/scu200/scu200_user-manual_3320180042.webp)
42
SCU200
INSITE ENERGY MANAGEMENT SYSTEM
5.3.Wizard
During Wizard configuration it is possible to do basic configuration of SCU and assign connected devices.
To enter the wizard, it is required to login to WebUI.
1. Credentials - The first mandatory step is to set new credentials. The new password must contain a
minimum of 8 characters, at least one uppercase letter and one number.
2. Time configuration – During this step it is recommended to set the correct device time.
3. Firmware update – It is recommended to update firmware to the newest version before proceeding
with the next steps.
4. Region and language – Select proper language, currency and timezone that will be used in the system.
5. Network connection – Configure how the device will be connected to your network.
After network configuration and connecting device to your network the next wizard steps will allow you
to configure Contracts/Tariffs and Scan/Add devices that are connected to the SCU. This configuration
can be skipped and configured later.
1. Start wizard – start or skip wizard for preliminary configurations.
2. Tariffs - In this preliminary phase, you can create profiles based on time slots, costs and consumption.
3. Scanning – In this step it is possible to select which type of devices should be scanned.
RS485
- Modbus RTU devices – It is required to setup correct baudrate, bytesize, parity and stop bits
for scanner. The connected RTU devices must have set Modbus ID between 33-48 to be automatically
detected/scanned. Only devices that respond to report slave id will be automatically detected. Based
on that response the device model will be selected or device will be added as unknown, and it will be
possible to configure it manually.
Wireless M-Bus
– Connected Wireless M-bus modules are automatically detected during system startup.
After scanning step, it will be possible to assign detected Wireless M-Bus Meters to Wireless M-bus
modules
INS-E3
– Connected INS-E3 are automatically detected during system startup. After scanning step, it will
be possible to configure CTS sensors and Type of network for each INS-E3
InSite Bus
– The devices connected to Insite Bus will have Modbus IDs assigned between 1-32. Maximum
no. Devices connected is 32 (I/O module count as 4 devices).
The I/O modules, INS-S/H, MOD & AR devices will be auto assigned automatically and listed after
scanning step.
The current sensors must be added manually after scanning step.
Modbus TCP devices
- must be added manually
4. Setup – In this step it is possible to make additional configuration for scanned/added devices and
select correct Contracts and device categories for them.
5. End – The configuration is finished; it is possible to go back to Scan devices or go to the system
dashboard.
Содержание SCU200
Страница 1: ...SCU200 User manual 1 0 1 INSITE ENERGY MANAGEMENT SYSTEM SCU200 User manual ...
Страница 2: ......
Страница 77: ...77 SCU200 INSITE ENERGY MANAGEMENT SYSTEM ...