U
UBase kV
<
⋅
(%)
(
)
3
EQUATION1429 V2 EN
(Equation 67)
and operation for phase-to-phase voltage under:
U
(%) UBase(kV)
<
×
EQUATION1990 V1 EN
(Equation 68)
When phase-to-earth voltage measurement is selected the function
automatically introduces division of the base value by the square root
of three.
9.1.7.1
Measurement principle
Depending on the set
ConnType
value, UV2PTUV measures phase-to-earth or phase-
to-phase voltages and compare against set values,
U1<
and
U2<
. The parameters
OpMode1
and
OpMode2
influence the requirements to activate the START outputs.
Either
1 out of 3
,
2 out of 3
, or
3 out of 3
measured voltages have to be lower than the
corresponding set point to issue the corresponding START signal.
To avoid oscillations of the output START signal, a hysteresis has been included.
9.1.7.2
Time delay
The time delay for step 1 can be either definite time delay (DT) or inverse time delay
(IDMT). Step 2 is always definite time delay (DT). For the inverse time delay two
different modes are available; inverse curve A and inverse curve B.
The type A curve is described as:
n
n
k
t
U
U
U
=
æ
ö
< -
ç
÷
<
è
ø
EQUATION1431 V2 EN
(Equation 69)
The type B curve is described as:
n
n
k
t
U
U
U
2.0
480
0.055
32
0.5
×
=
+
æ
ö
< -
×
-
ç
÷
<
è
ø
EQUATION1432 V2 EN
(Equation 70)
Section 9
1MRK 504 135-UEN A
Voltage protection
206
Technical manual
Содержание ret650
Страница 1: ...Relion 650 series Transformer protection RET650 Technical manual ...
Страница 2: ......
Страница 40: ...34 ...
Страница 62: ...56 ...
Страница 84: ...78 ...
Страница 208: ...202 ...
Страница 353: ...Table 236 Gray code conversion IEC06000523 V1 EN 1MRK 504 135 UEN A Section 12 Control 347 Technical manual ...
Страница 376: ...370 ...
Страница 414: ...408 ...
Страница 530: ...524 ...
Страница 562: ...556 ...
Страница 620: ...614 ...
Страница 668: ...662 ...
Страница 669: ...663 ...