Timer 2
Once activated, the timer runs until the set
CB failure delay
value is elapsed. The time
characteristic is according to DT. When the operation timer has reached the set maximum
time value
CB failure delay
, the
TRBU
output is activated. The value of this setting is made
as low as possible at the same time as any unwanted operation is avoided. A typical setting
is 90 - 150 ms which is also dependent on the retrip timer.
The minimum time delay for the retrip can be estimated as:
t
cbopen
maximum opening time for the circuit breaker
t
BFP_reset
is the maximum time for the breaker failure protection to detect the correct breaker function (the
current criteria reset)
t
margin
safety margin
It is often required that the total fault clearance time is less than the given critical time. This
time is often dependent on the ability to maintain transient stability in case of a fault close
to a power plant.
Figure 111:
Time line of breaker failure protection
Timer 3
This module is activated by the
CB_FAULT
signal. Once activated, the timer runs until the
set
CB fault delay
value is elapsed. The time characteristic is according to DT. When the
operation timer has reached the maximum time value, the
CB_FAULT_AL
output is
activated. After the set time an alarm is given so that actions can be done to repair the
circuit breaker. A typical value is 5 s.
CBfailuredelay Retriptime t
t
t
cbopen
BFP reset
margin
≥
+
+
+
_
Содержание RER620
Страница 1: ...Relion Protection and Control Advanced Recloser Protection and Control RER620 Technical Manual ...
Страница 2: ......
Страница 22: ...Section 1MAC309294 MB F 16 RER620 Technical Manual ...
Страница 88: ...Section 3 1MAC309294 MB F Basic functions 82 RER620 Technical Manual ...
Страница 278: ...Section 4 1MAC309294 MB F Protection functions 272 RER620 Technical Manual ...
Страница 362: ...Section 5 1MAC309294 MB F Control functions 356 RER620 Technical Manual ...
Страница 418: ...Section 7 1MAC309294 MB F Measurement functions 412 RER620 Technical Manual ...
Страница 428: ...Section 8 1MAC309294 MB F Recording functions 422 RER620 Technical Manual ...
Страница 464: ...Section 9 1MAC309294 MB F Other functions 458 RER620 Technical Manual ...
Страница 554: ...Section 10 1MAC309294 MB F General function block features 548 RER620 Technical Manual ...
Страница 568: ...Section 12 1MAC309294 MB F Relay physical connections 562 RER620 Technical Manual ...
Страница 574: ...Section 13 1MAC309294 MB F Technical data 568 RER620 Technical Manual ...
Страница 576: ...Section 14 1MAC309294 MB F Relay and functionality tests 570 RER620 Technical Manual ...
Страница 578: ...Section 15 1MAC309294 MB F Applicable standards and regulations 572 RER620 Technical Manual ...
Страница 582: ...Section 16 1MAC309294 MB F Glossary 576 RER620 Technical Manual ...
Страница 583: ......