S
TD S
TD
S
Old
Calculated
=
⋅
+
−
(
)
⋅
1
EQUATION1893-ANSI V1 EN-US
(Equation 477)
Where
S
is a new measured value to be used for the protection function
S
old
is the measured value given from the function in previous execution cycle
S
Calculated
is the new calculated value in the present execution cycle
TD
is settable parameter
The value of
TD
=
0.92
is recommended in generator applications as the trip delay is
normally quite long.
The calibration factors for current and voltage measurement errors are set % of rated
current/voltage:
IMagComp5, IMagComp30, IMagComp100
VMagComp5, VMagComp30, VMagComp100
IAngComp5, IAngComp30, IAngComp100
The angle compensation is given as difference between current and voltage angle
errors.
The values are given for operating points 5, 30 and 100% of rated current/voltage. The
values should be available from instrument transformer test protocols.
9.14
Broken conductor check BRCPTOC (46)
SEMOD171761-1 v3
9.14.1
Identification
SEMOD172362-2 v2
Function description
IEC 61850
identification
IEC 60617
identification
ANSI/IEEE C37.2
device number
Broken conductor check
BRCPTOC
-
46
1MRK 504 163-UUS A
Section 9
Current protection
Transformer protection RET670 2.2 ANSI
591
Application manual
Содержание RELION RET670
Страница 1: ...RELION 670 SERIES Transformer protection RET670 Version 2 2 ANSI Application manual ...
Страница 2: ......
Страница 48: ...42 ...
Страница 64: ...58 ...
Страница 74: ...68 ...
Страница 104: ...98 ...
Страница 194: ...188 ...
Страница 518: ...512 ...
Страница 618: ...612 ...
Страница 648: ...642 ...
Страница 666: ...660 ...
Страница 672: ...666 ...
Страница 682: ...676 ...
Страница 844: ...838 ...
Страница 868: ...862 ...
Страница 956: ...950 ...
Страница 964: ...958 ...
Страница 1004: ...998 ...
Страница 1014: ...1008 ...
Страница 1015: ...1009 ...