Time
The fault
occurs
Protection
operate time
Trip and Start
CCRBRF
Normal t
cbopen
Margin
Retrip delay t1
t
cbopen
after re-trip
t
BFPreset
Minimum back-up trip delay t2
Critical fault clearance time for stability
IEC05000479_2_en.vsd
IEC05000479 V2 EN
Figure 21:
Time sequences for breaker failure protection setting
7.
Set
t2
to
0.17 s
3.1.9
Calculating settings for pole discordance protection
CCRPLD
Pole discordance protection (CCRPLD) detects situations where the bus coupler
breaker has different switching states in the phases (one open and two closed or two
open and one closed). Pole discordance can be detected either from auxiliary breaker
contact status or by current measurement.
1.
Set
GlobalBaseSel
to
1
The settings are made in primary values. The values of the base primary
quantities are set in Global base 1.
2.
Set
Operation
to
On
3.
Set
tTrip
to
3 s
.
When asymmetry is detected, a trip signal is activated. The delay must be so long
that asymmetrical faults will not cause an unwanted trip.
4.
Set
ContSel
to
On
if the primary auxiliary contact circuits are connected.
5.
Set
CurrSel
to
Continuous monitor
.
The detection by means of current measurement can be constantly activated
(Continuous monitor) or activated in connection of breaker actions only (CB
oper monitor).
6.
Set
CurrRelLevel
to
10 %
of
IBase
.
1MRK 505 291-UEN A
Section 3
REQ650 setting examples
59
Application manual
Содержание Relion REQ650
Страница 1: ...Relion 650 series Breaker protection REQ650 Application manual ...
Страница 2: ......
Страница 20: ...14 ...
Страница 26: ...20 ...
Страница 48: ...42 ...
Страница 82: ...76 ...
Страница 90: ...84 ...
Страница 160: ...154 ...
Страница 178: ...172 ...
Страница 264: ...258 ...
Страница 288: ...282 ...
Страница 302: ...296 ...
Страница 330: ...324 ...
Страница 338: ...332 ...
Страница 339: ...333 ...