Information and material for the verification:
•
Protection or control unit, Intelligent electronic device (IED), configured and
with settings entered.
•
Configuration diagram for the IED
•
Terminal diagram for the IED, or plant circuit diagram including the IED
•
Technical reference manual for the IED
•
Relay test set for secondary injection
•
Means to indicate, measure and record operation and times, e.g. an event record-
ing facility
•
A bi-stable relay (BR) or two auxiliary relays to simulate a CB
•
Two push-buttons (SC, ST) to operate the BR and a change-over switch (SRY)
to simulate CBREADY
•
Possibly a switch simulation the Synchronism check (SYNC) condition
Figure 35:
Simulating the CB operation by a bi-stable relay and manual switches
IED
AR01 - CLOSE CB
Trip
AR01 - CB POS
AR01 - CB READY
BR
SC
ST
SRY
To test
set
+
-
en04000202.vsd
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...