96
Distance protection
Chapter 11
Verifying settings by secondary
injection
The table showing test points for three phase loops is used together with
.
5.2.1
Measuring the operate limit of set values
Procedure
1.
Supply the terminal with healthy conditions for at least two seconds.
2.
Apply the fault condition and slowly decrease the measured imped-
ance to find the operate value for of the phase to earth loop L3, test
point P1, according to
. Compare the result of the measure-
ment with the expected value according to
table 30
The corresponding binary signals that inform about the operation of the
phase-selection measuring elements are available in the local HMI under
the menu:
Measurements/Monitoring/Current phasors
and
7
R=0.8·
RLdFw
8
R=0.8·
RLdFw
9
X=0.2·
X1
10
X=0.8·X1
11
X=-0.5·
RFFwPP
·tan
(AngDir)
R=0.5·RFFwPP
Note! This test points is proposed to be used instead of
point 4, 5, 6 and 7 when shaped load characteristic is not
activated
(OperationLdCmd=OFF)
Test point
Value
Comments
X
0.8 (2
3)
RLdFw
= −
⋅ −
⋅
X
0.214
RLdFw
≈ −
⋅
X
0.2 (2
3)
RLdFw
= −
⋅ −
⋅
X
0.054
RLdFw
≈ −
⋅
R
0.2
1 tan(
90)
X
ArgNegDir
=
⋅
⋅
−
R
0.093
1
X set
≈
⋅
R
0.2
1 tan(
90)
X
ArgNegDir
=
⋅
⋅
−
R
0.373
1
X
≈
⋅
Содержание RELION REL670
Страница 8: ...Contents ...
Страница 54: ...46 Checking the optical connections Chapter 6 Checking the external optical and electrical connections ...
Страница 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Страница 78: ...70 Downloading settings and configuration from a PC Chapter 10 Configuring the IED and changing settings ...
Страница 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Страница 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Страница 198: ...190 Glossary Chapter 14 Glossary ...