IEC09000631-1-en.vsd
IEC09000631 V1 EN-US
Figure 70: IEC 61850: SCL Import option
7.6
Writing communication configuration to IED
GUID-EE2F7AE2-2EA6-4F16-94F1-E9472CF6BB50 v3
IEC communication depends on proper communication configuration in all IEDs that
communicate via IEC 61850. It is not possible to read the communication configuration from
the IED to PCM600.
However it is possible to make a configuration change in one IED, without affecting the
communication engineering. For example, when the Application Configuration tool
configuration is changed, but no changes are done for the instantiation or deletion of
functions that represent a logical node.
When a changed configuration is written to the IED, the user is asked to update the
communication configuration.
1.
Select Yes in the Update Communication window to update the communication
configuration part in the IED.
2.
Click No in the Update Communication window to keep the communication configuration
part in the IED. Other parts of the configuration will be updated.
If no changes have been done in the communication configuration part, click
No in the Update Communication window.
IEC09000729-1-en.vsd
IEC09000729 V1 EN-US
Figure 71: Update the communication configuration in the IED with the configuration
made in PCM600
1MRK 511 284-UEN B
Section 7
IEC 61850 communication engineering
650 series
85
Engineering manual
© Copyright 2013 ABB. All rights reserved