IEC15000020 V1 EN-US
Figure 11: Example of LHMI menu using BIM3
The signal “freezes” and will not change value even if, for example, a binary input signal voltage
changes level, or if a binary output is activated as the result of a protection function block
activating.
8.8.3.2
Forcing by using PCM600
GUID-E9D0DAE6-7A86-4FF9-943E-42039015D05B v2
In PCM600 the concept is a bit different compared to LHMI.The forcing is accomplished by
entering a forcing session. Within such a session, multiple signals on multiple I/O boards may
be edited and changed at the same time and has no effect on the IED. Once the user is
satisfied with the forcing setup, then all the changes can be effectuated simultaneously
towards the IED, potentially changing inputs and outputs on multiple I/O boards at the same
time. It is also possible to abort this operation (described in step 6 below) and to
1.
Right click on the IED in the plant structure and select
Signal Monitoring.
2.
Click on the
List View tab.
3.
Click
Forcing Session in the menu IED/Start Forcing.
IEC15000023 V1 EN-US
4.
Click
Start editing signal value for forcing on the tool bar.
IEC15000024 V1 EN-US
The Signal Monitoring menu changes and indicates the forcing values that can be edited.
1MRK 505 385-UEN C
Section 8
Testing IED operation
Breaker protection REQ650
55
Commissioning manual
© Copyright 2017 ABB. All rights reserved
Содержание RELION 650 SERIES
Страница 1: ...Relion 650 SERIES Breaker protection REQ650 Version 2 2 IEC Commissioning manual...
Страница 2: ......
Страница 20: ...14...
Страница 24: ...18...
Страница 32: ...26...
Страница 42: ...36...
Страница 48: ...42...
Страница 52: ...46...
Страница 64: ...58...
Страница 118: ...112...
Страница 126: ...120...
Страница 127: ...121...