PC with PCM600 installed along with the connectivity packages
corresponding to the IED used
•
Administration rights on the PC to set up IP addresses
•
Product documentation (engineering manual, installation manual,
commissioning manual, operation manual, technical manual and
communication protocol manual)
2.3
Checking the power supply
Check that the auxiliary supply voltage remains within the permissible input
voltage range under all operating conditions. Check that the polarity is correct.
2.4
Energizing the IED
2.4.1
Check the IED operation
Check all connections to external circuitry to ensure that the installation was made
correctly, before energizing the IED and carrying out the commissioning procedures.
Energize the power supply of the IED to start it up. This could be done in number
of ways, from energizing a whole cubicle to energizing a single IED. The IED time
must be set. The self-supervision function in the
Main menu/Monitoring/IED
status
or
Main menu/Monitoring/Internal events
menu in LHMI should also be
checked to verify that the IED operates properly.
2.4.2
IED start-up sequence
The following sequence is expected when the IED is energized.
•
The green Ready LED starts instantly flashing and the ABB logo is shown on
the LCD.
•
After approximately 30 seconds "Starting" is shown on the LCD.
•
Within 90 seconds the main menu is shown on the LCD and the green Ready
LED shows a steady light, which indicates a successful start-up.
The start-up times depend on the size of the application
configuration. Application configuration with less functionality
means shorter start-up times.
If the green Ready LED continues to flash after start-up, the IED has detected an
internal error. Navigate via
Main menu/Monitoring/IED status
to investigate the
fault.
Section 2
1MRS756801 A
Starting up
12
630 series
Commissioning Manual