Section 1
Introduction
1.1
This manual
The commissioning manual contains instructions on how to commission the IED.
The manual can also be used by system engineers and maintenance personnel for
assistance during the testing phase. The manual provides procedures for checking
of external circuitry and energizing the IED, parameter setting and configuration as
well as verifying settings by secondary injection. The manual describes the process
of testing an IED in a substation which is not in service. The chapters are organized
in chronological order in which the IED should be commissioned.
1.2
Intended audience
This manual addresses the personnel responsible for commissioning, maintenance
and taking the IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic
equipment. The commissioning and maintenance personnel must be well
experienced in using protection equipment, test equipment, protection functions
and the configured functional logics in the IED.