65
About this chapter
&KDSWHU
(VWDEOLVKLQJFRQQHFWLRQDQG
YHULI\LQJWKH63$,(&
FRPPXQLFDWLRQ
&KDSWHU (VWDEOLVKLQJ
FRQQHFWLRQDQG
YHULI\LQJWKH63$
,(&
FRPPXQLFDWLRQ
$ERXWWKLVFKDSWHU
This chapter contains instructions on how to establish connection and verify that the
SPA/IEC-communication operates as intended, when the terminal is connected to a
monitoring or control system via the rear SPA/IEC port.
Содержание REL 531
Страница 16: ...10 Note signs KDSWHU 6DIHW LQIRUPDWLRQ ...
Страница 44: ...38 Checking the binary I O circuits KDSWHU KHFNLQJ WKH H WHUQDO FLUFXLWU ...
Страница 52: ...46 Checking the self supervision signals KDSWHU QHUJLVLQJ WKH WHUPLQDO ...
Страница 132: ...126 Two step time delayed phase overcurrent protection TOC2 KDSWHU 9HULI LQJ VHWWLQJV E VHFRQGDU LQMHFWLRQ ...
Страница 136: ...130 Testing the interaction of the distance protection KDSWHU 9HULI LQJ WKH LQWHUQDO FRQILJXUDWLRQ ...
Страница 140: ...134 Testing the interaction of the distance protection KDSWHU 7HVWLQJ WKH SURWHFWLRQ V VWHP ...