About this chapter
Chapter 11
Verifying the internal configuration
Chapter 11 Verifying the
internal
configuration
About this chapter
The aim of this chapter is to verify that the internal communications and output signals
are according to the specification and normal protection praxis. This means that all in-
cluded protection functions must be in operation.