58 Hardware status
Warning and fault messages
Refer to the
PVS800-57B central inverters firmware manual
(3AXD50000048332[EN]).
Control unit BCU-12
BATT OK
Green
The battery voltage of the real-time clock is
OK (more than 2.8 V).
When the LED off:
• The battery voltage is less than 2.8 V
• The battery is missing
• The control unit is not powered
PWR OK
Green
The internal voltage is correct.
FAULT
Red
The control program indicates that the
equipment is faulty.
Refer to the firmware manual.
WRITE
Yellow
Writing to SD card in progress.
AC500
PWR
Green
The AC500 unit is powered.
RUN
Green
The AC500 program is running.
ERR
Red
An error or warning detected by the AC500
firmware.
MIRU-01
POWER
Green
The MIRU-01 unit is powered.
ERROR
Red
An error detected by the MIRU-01 firmware.
STATUS
Green
The status of the insulation resistance
measurement:
• Slow flash (1/s): Measurement ready
• Rapid flash (5/s): Measurement not ready
DISABLE
Red
Insulation resistance measurement is
disabled.
MGND-01
POWER
Green
The MGND-01 is powered.
GROUNDING STATUS
Green
The grounding voltage is OK (<50 V DC)
BAMU-11
POWER
Green
The BAMU-11 unit is powered.
LINK FAULT
Red
There is an error on the board or an error in
the PSL2 link.
U2 > 60V
Yellow
The input voltages (U2, V2 and W2) are
more than 60 V.
U1 > 60V
Yellow
The input voltages (U1, V1 and W1) are
more than 60 V.
Where
LED
Color
Indication
Содержание PVS800-57B
Страница 1: ...ABB SOLAR INVERTERS PVS800 57B central inverters Commissioning and maintenance manual...
Страница 4: ......
Страница 8: ...8...
Страница 16: ...16 Safety instructions...
Страница 22: ...22 Introduction to the manual...
Страница 27: ...Storing lifting and transporting 27 Moving the crate with a forklift...
Страница 38: ...38 Mechanical installation...
Страница 50: ...50 Electrical installation...
Страница 56: ...56 Start up and operation...
Страница 70: ...70 Maintenance 5 6 4 3...
Страница 71: ...Maintenance 71 7 8 8...
Страница 72: ...72 Maintenance 9 10...
Страница 76: ...76 Maintenance...