Start-up 99
8
Start-up
Contents of this chapter
This chapter describes the start-up procedure of the inverter. It also gives some advice for
operation.
Start-up procedure
The functioning of the inverter is first tested in the local control mode with the control panel
(CDP312R). Thereafter, the control program parameters are set. The start-up procedure is
described step-by-step in the table below.
SAFETY
WARNING!
Obey the safety instructions during the
installation and start-up procedure. See chapter
Only qualified electricians are allowed to install and start-up the
inverter.
PRIMARY AND AMBIENT CONDITION CHECKS
Check that the mechanical and electrical installation of the
inverter is OK. See chapter
Check that the insulation of the assembly is OK. See section
Checking the insulation of the assembly
, page
Note:
If the insulation is not OK, the
optional insulation resistance
monitoring (Q954, +Q976 or
+Q981) cannot be tuned properly.
Check that the ambient conditions for start-up, temperature and
humidity level is within the limits. See section
,
page
Note:
Depending on the humidity level or temperature, it can be
necessary to use cabinet heaters continuously for a longer time
before start-up.
Содержание PVS800-57-0100kW-A
Страница 1: ...ABB solar inverters Hardware manual PVS800 57 central inverters 100 to 1000 kW ...
Страница 4: ......
Страница 22: ...20 Safety instructions ...
Страница 64: ...62 Operation principle and hardware description ...
Страница 74: ...72 Mechanical installation ...
Страница 90: ...88 Electrical installation PE PE PE ...
Страница 124: ...122 Maintenance ...
Страница 152: ...150 Dimension drawings Frame R7i 3AUA0000083128 ...
Страница 153: ...Dimension drawings 151 AC output 3AUA0000083128 ...
Страница 154: ...152 Dimension drawings 3AUA0000083128 One DC input Four DC inputs ...
Страница 155: ...Dimension drawings 153 Frame R8i R8i 2 DC inputs option 2H382 or 4 DC inputs option 4H382 3AXD50000016935 ...
Страница 156: ...154 Dimension drawings R8i 8 DC inputs option 8H382 3AXD50000016935 ...
Страница 157: ...Dimension drawings 155 R8i AC output terminals 3AXD50000016935 ...
Страница 158: ...156 Dimension drawings R8i DC terminals of units with 2 DC inputs option 2H382 3AXD50000016935 ...
Страница 159: ...Dimension drawings 157 R8i DC terminals of units with 4 DC inputs option 4H382 3AXD50000016935 ...
Страница 160: ...158 Dimension drawings R8i DC terminals of units with 8 DC inputs option 8H382 3AXD50000016935 ...
Страница 162: ...160 Dimension drawings Frame 2 R8i 2 R8i 4 DC inputs option 4H382 or 5 DC inputs option 5H382 3AXD50000015007 ...
Страница 163: ...Dimension drawings 161 2 R8i 8 DC inputs option 8H382 or 10 DC inputs option 10H382 3AXD50000015007 ...
Страница 164: ...162 Dimension drawings 2 R8i 12 DC inputs option 12H382 or 15 DC inputs option 15H382 3AXD50000015007 ...
Страница 165: ...Dimension drawings 163 2 R8i AC output terminals 3AXD50000015007 ...
Страница 170: ...168 Dimension drawings Frame 3 R8i 3 R8i 8 DC inputs option 8H382 or 10 DC inputs option 10H382 3AXD50000015006 ...
Страница 171: ...Dimension drawings 169 3 R8i 12 DC inputs option 12H382 or 15 DC inputs option 15H382 3AXD50000015006 ...
Страница 172: ...170 Dimension drawings 3 R8i 16 DC inputs option 16H382 or 20 DC inputs option 20H382 3AXD50000015006 ...
Страница 173: ...Dimension drawings 171 3 R8i AC input terminals 3AXD50000015006 ...
Страница 178: ...176 Dimension drawings ...
Страница 179: ...Further information More information about ABB products for solar applications on the Internet www abb com solar ...
Страница 180: ...Contact us www abb com solar 3AUA0000053689 Rev H EN EFFECTIVE 2014 07 09 ...