Start-up and operation
Contents of this chapter
This chapter describes the start-up procedure of the PVS-175 medium voltage station (MVS)
and the general operation criteria.
WARNING!
Only an authorized electrician is permitted to install the cabling to the MVS. Obey
the
and the local safety regulations. If ignored,
physical injury or death, or damage to the equipment may occur.
WARNING!
Do not do electrical installation work during a thunderstorm.
Tools needed
•
Voltage detector
•
Insulation resistance meter. For more information, see section
resistance of the cabling (page 43)
.
•
Personal protective equipment
Prerequisite
WARNING!
Use original silica gel bags only during transport. Install new silica gel bags for
storage.
1.
Remove the transportation covers.
7
Start-up and operation 51
12
Содержание PVS-175 Series
Страница 1: ... ABB SOLAR INVERTERS PVS 175 medium voltage station Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 14: ...14 ...
Страница 26: ...26 ...
Страница 32: ...32 ...
Страница 40: ...6 Apply a layer of sealant around the hood border 40 Mechanical installation ...
Страница 48: ...48 ...
Страница 54: ...54 ...
Страница 60: ...Replacing component 1 Loosen and remove the external screws of the ventilation grille 60 Maintenance ...
Страница 68: ...68 ...
Страница 70: ......