When you route the cables:
•
Install the AC power cables and the control cables on separate routes.
•
Use metallic screen cables for control cables.
•
Do not put extra cables through the MVS without permission.
For more information, see drawing 3AES-PVS-175-MVS-01-DW02
यांित्रक
थापना
43
को
पूरा
करती
ह।
S/N:
NNNNNNNNNNNN
Description:
Medium Voltage Station
Type Designation:
PVS-175 - MVS - XXXX- Y +options
MADE IN SPAIN
MANUFACTURED IN 20XX
A
J
I
G
H
F
E
D
C
B
1
1
4
3
2
5
Ground
1
Inverters cable entry
2
Control cable entry (second option)
3
Control cable entry
4
MV cable entry
5
Earthing
Always construct an earthing electrode for the MVS. Always follow the local regulations.
Follow the minimum requirements for the earthing electrode:
•
Minimum cross-sectional area = 95 mm
2
. The plates are prepared for 95 mm
2
cables
•
Installation depth = 500...800 mm from the surface of the soil
•
Installation route around the MVS = one meter from the outer wall
•
Connect the MVS earthing busbar and the station enclosure to the earthing electrode.
Use joint lubricant to protect the connection point against corrosion
For more information, see drawing 3AES-PVS-175-MVS-02-DW02
42 Electrical installation
Содержание PVS-175 Series
Страница 1: ... ABB SOLAR INVERTERS PVS 175 medium voltage station Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 14: ...14 ...
Страница 26: ...26 ...
Страница 32: ...32 ...
Страница 40: ...6 Apply a layer of sealant around the hood border 40 Mechanical installation ...
Страница 48: ...48 ...
Страница 54: ...54 ...
Страница 60: ...Replacing component 1 Loosen and remove the external screws of the ventilation grille 60 Maintenance ...
Страница 68: ...68 ...
Страница 70: ......