Lifting
WARNING!
Inspect the container before any activity. Make sure that the container has no
protuberance, enough rings and is in good condition. Ignorance of this message
can cause physical injury, death or damage to the equipment.
Before lifting the MVS, follow these instructions.
•
Protect the corners of the MVS against shock.
•
The minimum rated loading capacity of each sling is ten tons
•
The minimum length of each sling is five meters.
•
Adjust the length of lifting slings so that the MVS does not tilt during lifting.
•
Do not allow the lifting slings to scratch the walls or roof. Damaged paint can lead to
corrosion.
•
Use a guide wire attached to a lower corner of the MVS to prevent rotation.
•
Do not throw slings or hooks onto the roof.
•
Do not stand on the roof during fastening the lifting slings or lifting.
•
Before loading, make sure that nobody is present under the load.
■
Tools used for lifting
•
20 tons bridge crane or 70 tons truck crane
•
four slings
•
Forklisft
Storing, lifting and transporting 29
Содержание PVS-175 Series
Страница 1: ... ABB SOLAR INVERTERS PVS 175 medium voltage station Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 8: ...8 ...
Страница 14: ...14 ...
Страница 26: ...26 ...
Страница 32: ...32 ...
Страница 40: ...6 Apply a layer of sealant around the hood border 40 Mechanical installation ...
Страница 48: ...48 ...
Страница 54: ...54 ...
Страница 60: ...Replacing component 1 Loosen and remove the external screws of the ventilation grille 60 Maintenance ...
Страница 68: ...68 ...
Страница 70: ......