- 57 -
000440AG
5 - Installation
C
onnections to the communication and control board
Each cable which must be connected to the communication and control
board must pass through one of the five
service cable glands.
• An M20 that takes cables from 7 mm to 13 mm in diameter. Gaskets
with two holes are supplied as standard to insert into the cable gland,
which enables two separate cables of a maximum cross-section of 5 mm
to be accommodated.
12
A
B
C