
Operation Manual / Power2 850-M / High-pressure stage
9 Disassembly and assembly / 9.11 Installing the cartridge group
© Copyright 2022 ABB. All rights reserved.
HZTL4063_EN
Rev.F
March 2022
9.11
Installing the cartridge group
Fig. 34: Installing O-rings
u
Fit new O-rings (42017 / 42018).
Fig. 35: Installing the cartridge group 1
1. Clean slots for lamellar rings (64001) and fit new lamellar rings. Arrange joints so that
they are offset by 180°.
2. Fit bracket (90030) and plates (90031).
3. Fit lifting gear to swivel lifting eye (90657).
4. Lift cartridge group and carefully move in.
Page
78
/
104
Содержание PT004149
Страница 2: ......