![ABB PRO-33.0-TL Series Скачать руководство пользователя страница 43](http://html.mh-extra.com/html/abb/pro-33-0-tl-series/pro-33-0-tl-series_product-manual_4126043.webp)
Mechanical installation 43
Unpack the delivery
1. Examine the package for damage.
2. Before you open the package, read the package labels to make sure that the
delivery is correct.
3. Move the inverter in its package to the installation area.
4. Open the shipping cover and examine the contents. Make sure that the package
contains the installation accessories:
•
Wall-mounting plate, locking screws M5x20 T25 stainless steel and washers
•
AC connector housing
•
Reducer seal for the AC cable gland
•
2 M25 and 1 M32 reducer seals for single-cables in the control cable glands
•
2 lifting eye bolts M10
•
Quick installation and start-up guide
5. Examine the type designation label on the inverter to make sure that it is the
correct unit. Refer to
on page
and
page
.
6. Do not remove items from the package until you are ready to install them.
7. Read the instructions and keep them available at the installation area.
Refer to
before you move the inverter.
Содержание PRO-33.0-TL Series
Страница 1: ...ABB solar inverters Product manual PRO 33 0 TL string inverters ...
Страница 4: ......
Страница 10: ...10 Table of contents ...
Страница 32: ...32 Hardware description ...
Страница 40: ...40 Installation requirements ...
Страница 70: ...70 Electrical installation ...
Страница 74: ...74 Installation checklist ...
Страница 110: ...110 Maintenance ...
Страница 134: ...134 Navigation map The navigation map ...
Страница 136: ...Contact us www abb com solarinverters 3AUA0000123261 Rev B EN 2015 06 18 ...