![ABB Power2 Series Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/abb/power2-series/power2-series_aassembly-instructions_4693053027.webp)
Assembly Instructions / Power2 500-M
5 Installing the high-pressure stage / 5.5 Completion work, if required
© Copyright 2020 ABB. All rights reserved.
HZTL455311P0009_EN
Rev.A
July 2020
Tightening pressure screws
Fig. 16: Tightening pressure screws
Power2
Fixing screw [mm]
Tightening torques [Nm]
550 HP
M30
43
Table 17: Tightening torque of clamping nut pressure screws
1. Screw in pressure screws crosswise by hand until reaching the stop.
2. Tighten pressure screws crosswise to 50 % of the tightening torque specified in the
table.
3. Tighten pressure screws crosswise to 100 % of the tightening torque specified in the
table.
4. Work in a circle to tighten all pressure screws to 100 % of the tightening torque specified
in the table.
5. Tighten pressure screws to 100 % in 5 … 7 rounds until the required residual tightening
angle of < 20° is achieved.
5.5
Completion work, if required
u
Attach all gas, air, water and oil pipes in accordance with the enginebuilder's instructions.
u
Fit insulation components.
u
Fit speed sensor and plug in cable connector.
Page
25
/
29
Содержание Power2 Series
Страница 2: ......