Operation Manual / Power2 850-M / 4.2 High-pressure stage
2 Removal and installation / 2.3 Installing the high-pressure stage
© Copyright 2017 ABB. All rights reserved.
HZTL4063_EN
Revision A
August 2017
2.3
Installing the high-pressure stage
CAUTION
Tilting of high-pressure stage and leaks at bellows
The high-pressure stage must not be transported or put down with the air
suction branch and the bellows fitted.
u
The air suction branch / bellows combination must be transported and
fitted separately.
Fig. 2: Suspension of complete high-pressure stage
u
Attach one lifting gear to the two suspension points of the bearing casing and one lifting
gear to the support.
u
Check that the orifices specified for the high-pressure stage are installed in the two oil
supply pipes.
u
Check that the gaskets have been correctly fitted at the oil inlet and the oil outlet in the
bracket.
u
Check that the sleeves of the bearing casing fixing screws have been correctly fitted.
u
Align the high-pressure stage on the engine.
u
Tighten fixing elements at the foot and support in accordance with the enginebuilder's in-
structions.
u
Connect the cable connector to the speed sensor.
u
Install air suction branch together with bellows
(see Fig. 22: Installing the air suction
u
Attach all gas, air, water and oil pipes in accordance with the enginebuilder's instructions.
u
Fit insulation.
Page
5
/
35
Содержание Power2 850-M16
Страница 28: ......
Страница 32: ......
Страница 42: ......
Страница 44: ......
Страница 70: ......
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 92: ......
Страница 94: ......
Страница 96: ......
Страница 100: ......
Страница 130: ......
Страница 134: ......
Страница 138: ......
Страница 140: ......
Страница 142: ......
Страница 178: ......