Perform a visual inspection of the sealing points (flange connection to the gas inlet cas-
ing and gas outlet casing).
Always replace bellows with damaged sealing locations with a new bellows.
Always replace dismantled gaskets with new gaskets.
15.3
Removal and installation
15.3.1
Weight
Product
Weight [kg]
Gas piping for GEJ920 (Power2 650)
30
Table 68: Weight
15.3.2
Removing gas piping
Only use textile lifting gear to lift the gas piping.
Fig. 53: Removing gas piping
u
Loosen nuts (51013) and remove with Verbus Ripp® washers (51012) and screws (51011).
u
Loosen the V-clamp (61072) and slide at bellows side.
u
Remove gas piping (85001) with metal C-rings (85002/61007).