background image

 

PositionMaster EDP300

 DIGITAL POSITIONER  |  IN/EDP300/PRESSURE_OPTION-XS REV. A 

XS – 3

 

 

 

 

Mounting instructions

 

The screws should be tightened in the sequence as shown 
numbered in the figure by applying a torque of 1 Nm. 
 

Test instructions / function testing 

After the pressure plate is mounted, supply from 4 to 20 mA to 
the positioner and look for the P / P1 / P2 pressure readings on 
the device display in the ‘Signals Views’ menu item. The device 
does not need to be supplied with compressed air for this 
purpose. Basically, all 3 pressure readings should be displayed at 
this point and in this case, everything is OK. Adjustment of the 
pressure readings is not required, since the plate has already 
been adjusted at the factory. 
If the following display appears, an error has occurred. (‘Plate is 
defective’ 

 In this case, please contact ABB Automation GmbH 

- Service Instruments -): 
P     --- 
P1   --- 
P2   --- 
 
If the pressure plate is not connected with the main circuit board 
(connector is not inserted), the 3 pressure readings P / P1 / P2 
are not displayed in the menu. 
 

EX Requirement 

If we are dealing with Ex devices, the customer must have the 
modification checked by an Ex expert. 
If this should not be possible, it is imperative that the 
modification be tested at the factory! 
Contact partner: ABB Automation GmbH - Service Instruments - 
 

 

3

Содержание PositionMaster EDP300

Страница 1: ...itionMaster EDP300 Instruction PositionMaster EDP300 For digital positioners EDP300 Page 2 Anleitung PositionMaster EDP300 F r digitale Stellungsregler EDP300 Seite 4 Instruktion PositionMaster EDP300...

Страница 2: ...connections on the screw terminals 3 If present unscrew the option modules and remove them from the side 4 If present remove the mechanical position indication and screw off the shaft extension as wel...

Страница 3: ...displayed at this point and in this case everything is OK Adjustment of the pressure readings is not required since the plate has already been adjusted at the factory If the following display appears...

Страница 4: ...ckel l sen und den Geh usedeckel abnehmen 2 S mtliche Kabelverbindungen an den Schraubklemmen l sen 3 Falls vorhanden die Optionsmodule losschrauben und seitlich herausnehmen 4 Falls vorhanden die mec...

Страница 5: ...m Fall ist alles in Ordnung Ein Abgleich der Dr cke ist nicht erforderlich weil die Platine bereits im Werk abgeglichen wurde Es liegt ein Fehler vor wenn die folgende Anzeige erscheint Platine ist de...

Страница 6: ...arna fr n huslocket och ta bort det 2 Lossa samtliga kabelanslutningar fr n skruvplintarna 3 Skruva loss tillvalsmodulerna i f rekommande fall och ta ut dem fr n sidan 4 Dra av de mekaniska l gesindik...

Страница 7: ...tta Normalt ska alla 3 tryck visas h r i s fall r allt som det ska Trycken beh ver inte kalibreras eftersom kretskortet redan har kalibrerats p fabriken Om f ljande indikering visas f religger ett fel...

Страница 8: ...document without prior notice With regard to purchase orders the agreed particulars shall prevail ABB does not accept any responsibility whatsoever for potential errors or possible lack of information...

Отзывы: