3 Installation and commissioning
3.1 Introduction to installation and commissioning
General
This chapter contains assembly instructions and information for installing the
OmniCore C90XT controller at the working site.
See also the product manual for the manipulator.
The installation must be done by qualified installation personnel in accordance
with the safety requirements set forth in the applicable national and regional
standards and regulations.
Safety information
Before any installation work is commenced, it is extremely important that all safety
information is observed.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
before performing any installation
work.
Note
If the OmniCore C90XT is connected to power, always make sure that the robot
is connected to protective earth and a residual current device (RCD) before
starting any installation work.
Product manual - OmniCore C90XT
51
3HAC073706-001 Revision: D
© Copyright 2020-2021 ABB. All rights reserved.
3 Installation and commissioning
3.1 Introduction to installation and commissioning
Содержание OmniCore C90XT
Страница 1: ...ROBOTICS Product manual OmniCore C90XT ...
Страница 2: ...Trace back information Workspace 21A version a14 Checked in 2021 03 30 Skribenta version 5 4 005 ...
Страница 50: ...This page is intentionally left blank ...
Страница 350: ...This page is intentionally left blank ...
Страница 354: ...This page is intentionally left blank ...
Страница 412: ...This page is intentionally left blank ...
Страница 444: ...This page is intentionally left blank ...
Страница 448: ......
Страница 449: ......