ABB-Welcome
Operation
|
— 25 —
5
Operation
Pos : 19 /DinA4 - Anl eitungen Onli ne/Ueberschrif ten/ 2. /Nor maler Betrieb @ 18\ mod_1302768820965_15.doc x @ 103540 @ 2 @ 1
5.1
Pushbutton outdoor station
Fig. 11
Pushbutton outdoor station
Pos : 20 /DinA4 - Anl eitungen Onli ne/Ueberschrif ten/ 3. /Bedi enel ement e @ 20\ mod_1323260220559_15.doc x @ 111647 @ 3 @ 1
5.1.1
Addressing
1.
Configure functions of the 1st / 2nd push button
3
4
DIP
1
2
3
1
2
3
4
001
002
003
Содержание M25102xC Series
Страница 9: ...ABB Welcome Terminal description 9 4 1 1 Lock connected with terminals 3 4 ...
Страница 10: ...ABB Welcome Terminal description 10 4 2 Camera module Fig 3 Terminal description ...
Страница 13: ...ABB Welcome Terminal description 13 ...
Страница 15: ...ABB Welcome Terminal description 15 ...
Страница 59: ...ABB Welcome Mounting Installation 59 Cover frame ...
Страница 60: ...ABB Welcome Mounting Installation 60 Flush mounted box ...
Страница 61: ...ABB Welcome Mounting Installation 61 Rain hood ...