
4.9 Replacing the cable chain and cables
4.9.1 Replacing the cable chain
Location of the cable chain
The figure shows the cable chain and the cable tray designed for the cable chain.
xx1400000742
Cable chain
A
Sheet metal
B
Sloped sheet metal used when the track travel length is no less than 5 m
C
Required equipment
Note
Equipment
Spare part number is specified in
.
Cable chain
Spare part number is specified in
.
Cable chain parts
Loctite 243
Locking liquid
Replace if damaged.
Plastic clips
Replace with new nuts, if removed. NYLOC nuts can
only be used once.
NYLOC nuts
Content is defined in section
.
Standard toolkit
These procedures include references to the tools re-
quired.
Other tools and procedures may be
required. See references to these
procedures in the step-by-step in-
structions below.
See
.
Circuit diagram
Moving away the carriage
Illustration/Note
Action
Remove all cover plates.
1
Continues on next page
Product manual - IRBT 2005
241
3HAC051130-001 Revision: F
© Copyright 2015 - 2018 ABB. All rights reserved.
4 Repair
4.9.1 Replacing the cable chain
Содержание IRBT 2005
Страница 1: ...ROBOTICS Product manual IRBT 2005 ...
Страница 2: ...Trace back information Workspace R18 2 version a15 Checked in 2018 10 30 Skribenta version 5 3 012 ...
Страница 8: ...This page is intentionally left blank ...
Страница 44: ...This page is intentionally left blank ...
Страница 148: ...This page is intentionally left blank ...
Страница 284: ...This page is intentionally left blank ...
Страница 286: ...This page is intentionally left blank ...
Страница 289: ......